On November 2nd 2017 a SIRE inspection was performed by SHELL in our MT PANAGIA THALASSINI at Ulsan (North Korea).
The inspection’s result was EXCELLENT with NO observations.
On November 2nd 2017 a SIRE inspection was performed by SHELL in our MT PANAGIA THALASSINI at Ulsan (North Korea).
The inspection’s result was EXCELLENT with NO observations.