On February 11th 2018 a SIRE inspection was performed by SHELL in our MT MARKOS I at Dalian (China).
The inspection’s result was VERY GOOD with 4 observations.
On February 11th 2018 a SIRE inspection was performed by SHELL in our MT MARKOS I at Dalian (China).
The inspection’s result was VERY GOOD with 4 observations.