On January 03rd 2017 a SIRE inspection was performed by BP in our MT IOANNIS I at Yosu (Korea).
The inspection’s result was EXCELLENT with only 3 observations.
On January 03rd 2017 a SIRE inspection was performed by BP in our MT IOANNIS I at Yosu (Korea).
The inspection’s result was EXCELLENT with only 3 observations.