On October 03rd, 2023 a SIRE inspection was performed by Marathon Petroleum in our MT “SANTIAGO I” at Rotterdam (Netherlands).
The inspection’s result was VERY GOOD with 3 minor observations.
On October 03rd, 2023 a SIRE inspection was performed by Marathon Petroleum in our MT “SANTIAGO I” at Rotterdam (Netherlands).
The inspection’s result was VERY GOOD with 3 minor observations.