Jul 22, 2013
On July 1st 2013, a CDI Inspection in MT Loukas I was performed by Marine Surveyor Capt. Dzielak in Tampico (Mexico). Only 2 observations were found which is a very satisfactory...
Jun 12, 2013
On May 27th 2013, MT Mattheos carried out a CDI Inspection by Capt. Drego in Savannah, GE, (USA). The inspection´s results were satisfactory with only 6 observations.
May 20, 2013
“On May 13th 2013, MT “Loukas I” carried out a SIRE Inspection by Marine Surveyor Capt. Mehdi from BHP Rightship in the port of Rosarito (Mexico). The inspection´s results were very satisfactory with only 3...
Apr 22, 2013
On April 17th 2013, a SIRE Inspection in MT MARKOS I was performed by Cap. R. Lozano from Rightship in Pajaritos (Mexico). Only 3 observations were found which is a result very...
Apr 5, 2013
On March 22nd 2013, MT Mattheos I carried out a SIRE Inspection by Marine Surveyor Capt. Yap from BP Shipping in Shangai (China). The inspection´s results were very satisfactory with only 2...
Apr 5, 2013
On March 16th 2013, MT Ioannis I carried out a SIRE Inspection by Marine Surveyor Mr. Lux from BP Shipping in Aratu (Brazil). The inspection´s results were satisfactory with only 6...