On December 15th 2014, MT Ioannis I carried out a Chevron SIRE Inspection at Corpus Christi (Texas). The inspection´s results were satisfactory with only 4...
On November 20th 2014, Rightship executed a SIRE inspection in MT LOUKAS I at the port of Manzanillo (Mexico). The inspection´s results were satisfactory with only 3...
On November 28th 2014, MT Mattheos I carried out a Statoil SIRE Inspection at La Libertad (Ecuador). The inspection´s results were satisfactory with only 4...
On September 05th 2014, the inspector Raul Hernandez from Lloyds Register carried out an ISO 14001 inspection in Houston (USA). The inspection´s results were very satisfactory with only 3...